Network & IT Infrastructure

Infrastructure that connects every part of your business.

From the access switch to the branch uplink, a dependable network starts with coordinated decisions. FBT designs, deploys and documents business network infrastructure around the applications, devices and facilities it needs to support.

Request a Consultation

THE OPERATIONAL CHALLENGE

A better foundation for the next step.

A new application can expose an old bottleneck. Undocumented VLANs, insufficient power budgets and improvised patching make change harder and faults slower to isolate.

Bring topology, addressing, device configuration and physical connections into one understandable system. The handover includes the records your operational team needs to maintain it.

Explore the full scope

THE SERVICE CATALOGUE

Specific expertise. Practical deliverables.

20 distinct services within network & it infrastructure. Select the tasks your project needs; scope, ownership and acceptance are agreed before delivery.

01

LAN architecture design

Plan a network around users, applications, physical layout and future capacity. Define access, aggregation and uplink requirements with a clear rationale for resilience and management choices.

Deliverable

Logical topology and equipment schedule.

02

Access switch deployment

Install and configure access switches against an approved port plan. Confirm uplinks, endpoint connectivity and power requirements, recording the final configuration so support teams can trace each connection.

Deliverable

Configured switches and port-mapping records.

03

Core and distribution switching

Build the switching layer that connects floors, buildings or access networks. Validate agreed redundancy and routing behaviour during controlled tests with rollback arrangements agreed before the change.

Deliverable

Core configuration and failover test evidence.

04

Business router installation

Deploy business routers with agreed WAN settings, routing requirements and management access. Coordinate provider handoffs and verify traffic paths before transferring operational ownership to the customer's team.

Deliverable

Router configuration and connectivity checks.

05

VLAN and subnet design

Separate operational networks according to device roles and approved access requirements. Document addressing, VLAN assignment and routing dependencies so new services can be introduced consistently.

Deliverable

IP plan and VLAN allocation schedule.

06

Inter-VLAN routing implementation

Configure the routing relationships needed between authorized business networks. Test actual application paths and document dependencies instead of assuming that basic reachability proves a working service.

Deliverable

Routing tables and application-path test results.

07

WAN circuit integration

Coordinate carrier termination, customer equipment and branch connectivity. Confirm handoff media, addressing and service readiness with the provider, keeping circuit ordering responsibilities explicit in the scope.

Deliverable

WAN handoff record and circuit validation.

08

Branch connectivity deployment

Connect a branch to the organization's approved network design. Stage equipment, validate local addressing and test business applications with central IT before the location enters service.

Deliverable

Branch commissioning checklist and as-built topology.

09

Power-over-Ethernet planning

Calculate endpoint power requirements across access points, cameras, phones and other supported devices. Match switch budgets and uplink capacity to the device schedule, allowing for startup and growth requirements.

Deliverable

PoE allocation and capacity worksheet.

10

Network rack integration

Coordinate racks, switches, patching and cable management into a maintainable installation. Review space, power and cooling dependencies and label connections so future technicians can work accurately.

Deliverable

Rack elevation and connection schedule.

11

Server network integration

Connect physical or virtualized server hosts to the agreed switching environment. Confirm link capacity, redundancy and storage or management interfaces in coordination with the system administrator.

Deliverable

Host connectivity map and validation evidence.

12

DHCP service configuration

Implement approved address scopes, reservations and relay arrangements. Check how endpoints obtain network settings and document exclusions to prevent accidental overlap with fixed-address equipment.

Deliverable

Scope configuration and allocation records.

13

DNS infrastructure coordination

Configure or coordinate internal name-resolution requirements for the agreed systems. Test business service records and escalation ownership, distinguishing internal work from public domain administration.

Deliverable

DNS change record and resolution tests.

14

Network equipment migration

Move workloads or endpoints onto replacement infrastructure using a documented sequence. Prepare configuration backups, dependency checks and a rollback plan before the agreed maintenance window.

Deliverable

Migration runbook and completion record.

15

Network performance assessment

Investigate throughput, link errors and application connectivity using agreed observation points. Separate physical, configuration and capacity factors so recommendations address the actual source of degraded performance.

Deliverable

Measured findings and corrective recommendations.

16

Network configuration backup

Establish export and retention routines for supported network equipment. Record where approved copies are stored, who may restore them and how changes remain linked to the configuration history.

Deliverable

Backup procedure and restore verification.

17

Resilient uplink deployment

Implement supported link redundancy or aggregation where the approved architecture requires it. Validate expected behaviour under a controlled failure and record limitations that affect continuity.

Deliverable

Uplink design and resilience test results.

18

Network management onboarding

Add supported devices to the customer's chosen monitoring and administration platform. Confirm device identification, telemetry access and alert routing without promising a staffed monitoring service by default.

Deliverable

Managed-device register and alert ownership map.

19

Network commissioning

Execute an agreed acceptance plan covering links, addressing, endpoint reachability and key applications. Record exceptions with owners and evidence so handover is based on observed results.

Deliverable

Commissioning report and outstanding-items log.

20

Network as-built documentation

Capture final device identities, physical connections, addressing and configuration references. Align records with installed equipment so future support and change planning do not depend on memory.

Deliverable

As-built diagrams and editable asset register.

Network & IT Infrastructure
FROM SYSTEM TO EXPERIENCE

Infrastructure that connects every part of your business.

Bring topology, addressing, device configuration and physical connections into one understandable system. The handover includes the records your operational team needs to maintain it.

Follow the delivery process

TECHNICAL SCOPE

Clear interfaces.
Clear ownership.

Carrier services, electrical work and application administration are included only when explicitly assigned. This is infrastructure delivery, not a cybersecurity service.

Project applications

  • Corporate offices
  • Branch networks
  • Warehouses
  • Multi-floor facilities
Discuss your application

Delivery approach

A clear path from brief to handover

  1. 01

    Discover

    Agree the scope, users, premises and acceptance needs.

  2. 02

    Design

    Document the architecture, device schedules and dependencies.

  3. 03

    Coordinate

    Confirm materials, access and the resources assigned to the work.

  4. 04

    Deploy

    Implement the approved configuration and physical installation.

  5. 05

    Validate

    Test the actual workflows and record exceptions with owners.

  6. 06

    Support

    Transfer documentation and agree the operating responsibilities.

TECHNICAL HANDOVER

Make the result useful beyond installation.

Capture final device identities, physical connections, addressing and configuration references. Align records with installed equipment so future support and change planning do not depend on memory. As-built diagrams and editable asset register.

Business applications & connectivity
Core networkAccess switchingWireless access
Staff · phones · cameras · business devices

YOUR QUESTIONS

Network & IT Infrastructure
explained.

Selected equipment can be assessed for capacity, support and compatibility. Reuse is documented rather than assumed from the presence of spare ports.

The endpoint schedule is compared with the switch power budget and port capabilities, including the devices expected to start together.

Yes, within an approved addressing and connectivity design. The handover records assignments, routing dependencies and tested application paths.

A staged migration is possible when topology and application dependencies support it. Each phase needs defined checks and rollback conditions.

The customer or assigned provider owns the commercial circuit order unless coordination is explicitly included. FBT can support technical handoff validation.

The change plan identifies expected disruption and a maintenance window. No zero-interruption promise is made without a design and demonstrated method.

Agreed link, addressing and application checks, supported by results and an exception register, form the basis for acceptance.

Yes, the agreed handover includes configuration references, topology, asset identities and useful physical connection records.

FUTURE BRIDGES

Tell us what you are planning.

From one facility to a coordinated international programme, start with the scope, location and outcome you need.

Request a Consultation