Global IMAC & Field Engineering

The right onsite work. Connected to your technical team.

Global IMAC and field engineering bring physical installation, moves, additions and changes into a coordinated delivery process. FBT supports authorized onsite tasks with a clear work order, readiness checks, remote escalation and useful completion evidence.

Request a Consultation

THE OPERATIONAL CHALLENGE

A better foundation for the next step.

A remote team cannot verify an unlabelled cable or replace a failed appliance without local hands. Attendance alone is not an outcome: the engineer needs the correct scope, access, parts and acceptance criteria.

Connect your central technical direction with available regional and partner resources. Each dispatch is confirmed against the actual site, skills and schedule, with exceptions visible in the handover.

Explore the full scope

THE SERVICE CATALOGUE

Specific expertise. Practical deliverables.

20 distinct services within global imac & field engineering. Select the tasks your project needs; scope, ownership and acceptance are agreed before delivery.

01

Installation dispatch

Coordinate an onsite engineer for an approved installation task after checking coverage, skills and site readiness. Define the work order and acceptance evidence before confirming attendance.

Deliverable

Dispatch confirmation and completed work order.

02

Technology relocation

Move agreed equipment within or between facilities using documented connection and handling requirements. Coordinate downtime, access and destination readiness so the move has a clear acceptance point.

Deliverable

Move schedule and reconnection record.

03

Equipment addition

Add approved devices to an existing technology environment. Verify the available ports, mounting, power and configuration dependencies before installing the new component and recording its identity.

Deliverable

Installed-device record and functional checks.

04

Configuration change execution

Carry out centrally approved configuration changes at the site when physical attendance is required. Follow the supplied method and escalation path, documenting results and any unexpected condition.

Deliverable

Change evidence and technician completion notes.

05

Smart-hands assistance

Provide physical tasks under the direction of an authorized remote technical team. Capture clear photographs, labels and observations so the remote specialist can make informed decisions.

Deliverable

Task evidence and remote-session record.

06

Rack-and-stack attendance

Mount and connect approved equipment in a prepared rack. Confirm weight, rail compatibility, port assignments and power instructions before work begins; live electrical work remains separately assigned.

Deliverable

Rack installation evidence and asset details.

07

Break-fix site attendance

Attend a scoped equipment fault where onsite inspection or replacement is needed. Confirm parts availability and customer authorization before promising a restoration outcome or dispatch window.

Deliverable

Diagnostic findings and repair record.

08

Device swap deployment

Replace approved endpoints or network devices using the agreed staging and return process. Record serial numbers and verify service operation, preserving the customer's asset chain of custody.

Deliverable

Swap record and return-material details.

09

Site readiness survey

Inspect proposed locations for pathways, equipment space, connectivity and installation dependencies. Record access restrictions and unresolved conditions before deployment resources are booked.

Deliverable

Site survey and readiness checklist.

10

Network cutover support

Support a planned network change with physical patching, equipment checks and local validation. Work to a shared runbook with a remote lead and clear rollback criteria.

Deliverable

Cutover evidence and acceptance checklist.

11

Retail technology attendance

Deliver scoped installation or replacement work around store operating requirements. Coordinate access to tills, communications cupboards and trading areas with the named site contact.

Deliverable

Store work order and opening-readiness checks.

12

Branch equipment installation

Install preapproved branch technology from a site pack. Validate local connections and escalate differences from the design so an undocumented site exception does not become a wider support problem.

Deliverable

Branch installation record and exception log.

13

Data-center remote hands

Perform authorized physical tasks in an accessible data-center environment. Confirm access sponsorship, rack coordinates and evidence restrictions before attendance; facility permissions remain a prerequisite.

Deliverable

Task log and authorized installation evidence.

14

After-hours deployment planning

Arrange an agreed maintenance-window visit where business operations limit daytime work. Confirm staffing, access and escalation availability before attendance rather than offering blanket response guarantees.

Deliverable

Window plan and readiness confirmation.

15

Hardware collection coordination

Coordinate collection of approved equipment for return, repair or redeployment. Record identifiers and handover details, keeping disposal and data-handling instructions under the customer's authorization.

Deliverable

Collection inventory and custody receipt.

16

Cable tracing visits

Identify physical connections using agreed methods and safe access to both ends. Record ambiguous links and label verified connections so later remediation can be scoped with confidence.

Deliverable

Trace results and updated connection records.

17

Site photo documentation

Capture authorized photographs that explain equipment condition, labels and installation progress. Avoid sensitive details and follow site-specific evidence rules before sharing records with the project team.

Deliverable

Organized photo evidence and annotation index.

18

Field acceptance testing

Execute the specified onsite checks with expected results defined in the work order. Record failures and escalation actions so attendance does not get confused with successful commissioning.

Deliverable

Signed test checklist and exception evidence.

19

Regional engineer coordination

Match a programme's task requirements to available regional or partner resources. Confirm coverage for each site and avoid representing a coordination network as permanent offices everywhere.

Deliverable

Coverage confirmation and resource schedule.

20

Field handover reporting

Consolidate engineer notes, asset details and acceptance evidence after attendance. Make incomplete work and next actions visible to the customer or remote operations team.

Deliverable

Handover pack and outstanding-actions list.

Global IMAC & Field Engineering
FROM SYSTEM TO EXPERIENCE

The right onsite work. Connected to your technical team.

Connect your central technical direction with available regional and partner resources. Each dispatch is confirmed against the actual site, skills and schedule, with exceptions visible in the handover.

Follow the delivery process

TECHNICAL SCOPE

Clear interfaces.
Clear ownership.

Availability is confirmed per work order. Travel, parts, permits, access sponsorship and specialist trade work must be assigned before dispatch.

Project applications

  • Branch refreshes
  • Retail attendance
  • Data-center tasks
  • Remote technical support
Discuss your application

Delivery approach

A clear path from brief to handover

  1. 01

    Discover

    Agree the scope, users, premises and acceptance needs.

  2. 02

    Design

    Document the architecture, device schedules and dependencies.

  3. 03

    Coordinate

    Confirm materials, access and the resources assigned to the work.

  4. 04

    Deploy

    Implement the approved configuration and physical installation.

  5. 05

    Validate

    Test the actual workflows and record exceptions with owners.

  6. 06

    Support

    Transfer documentation and agree the operating responsibilities.

TECHNICAL HANDOVER

Make the result useful beyond installation.

Consolidate engineer notes, asset details and acceptance evidence after attendance. Make incomplete work and next actions visible to the customer or remote operations team. Handover pack and outstanding-actions list.

An authorized site work order
Site readinessDirected onsite taskEvidence of result
Technical lead reviews the evidence before work-order closure

YOUR QUESTIONS

Global IMAC & Field Engineering
explained.

The work order is checked for scope, location, access, skills, parts and acceptance evidence before resource availability is confirmed.

Install, move, add and change: practical work on technology equipment and its connections, performed against an approved task scope.

Yes. Smart-hands work can follow an authorized remote lead with agreed communication, escalation and evidence requirements.

No. International delivery uses available regional and partner resources, and each site and schedule requires confirmation.

Yes, where compatible equipment and authorization are provided. Serial capture, service checks and return handling are agreed in the work order.

The engineer records the dependency and escalates it. Unapproved design changes are not silently substituted for the planned task.

Attendance requires the appropriate facility sponsor and permissions. Access approval is established before dispatch.

The agreed pack may include test results, asset identities, authorized photographs, completion notes and clearly assigned outstanding work.